Sun Bear Solar Farm Will Be Eight Miles Long, One Mile Wide, And Have Two Million Solar Panels. February, 2024
The environmental assessment and consultation process for the Sun Bear Solar Farm was aided by a 3D model covering the 775 square mile installation. Collaboration between the Carigou Group, RICK Engineering, and the Ute Mountain Ute Tribe… Read More »Sun Bear Solar Farm Will Be Eight Miles Long, One Mile Wide, And Have Two Million Solar Panels. February, 2024